/
Follow up per project code
Follow up per project code
This report of for a financial follow up on specific project codes within a given year.
Upon selection of a project code the report will return an overview for all years:
If you filter for a specific year you will also have a summary per month:
Proportional: this is a calculation of the transport cost for the line (packing/goods invoice). Given the total transport cost the system calculates how much can be allocated to a specific packing based on its weight for AIR and ROAD transport and on its volume for SEA transport
Transport price: this is the total transport cost of the sub-freight
Note that, as almost everywhere in the Extranet, this report can be downloaded in Excel (look for the Excel icon on the upper right corner of the screen)