/
Follow up per project code

Follow up per project code

This report of for a financial follow up on specific project codes within a given year.

 

Upon selection of a project code the report will return an overview for all years:

If you filter for a specific year you will also have a summary per month:

 

Proportional: this is a calculation of the transport cost for the line (packing/goods invoice). Given the total transport cost the system calculates how much can be allocated to a specific packing based on its weight for AIR and ROAD transport and on its volume for SEA transport

Transport price: this is the total transport cost of the sub-freight

 

Note that, as almost everywhere in the Extranet, this report can be downloaded in Excel (look for the Excel icon on the upper right corner of the screen)

Related content