This report shows the number of days for each lead time segment as defined below.

For a better rendering, the report should be opened in Google Chrome browser.

The central date used to show the data is the order confirmation date in MSF Supply. This means that an order created in year n and confirmed in year n+1 will be shown in the year n+1 data here.

Overall filter : OCB delivered clients only.



Field

Remarks

Transport Mode

Transport mode of the freight. If null or no freight, it is the transport mode of the OP

Dispatch Code

Delivery code defined in MSF Supply, usually associated with the capital

Country

Mission

Project Code

Identification code for project

Orderline Count

Number of order lines (OP)

Order Type 

It shows the order type (MED or LOG) as in the OP

IsEmergency 

The order was handled as an emergency in MSF Supply, i.e. prioritized and managed with an emergency number

Is TechOrder 

Order lines handled as Technical orders

IsArticleKC

Keep cool goods:

KC1, KC1*, KC2, KC2*, KC2SA, KCC Keep Cool 2-8 °C
KC1RT, KC2RT, KC3RT Keep Cool 2-8 °C - Regulated transport
KC3, KC3*, KC4 Keep Freeze -20°C

IsDossierGreenLight

Allow to filter the lines which have been treated with or without a green light from the mission

With GreenLight / Without GreenLight

Order lines for a country with or without pre-clearence requirement

S02 Validation LT

Lead time (LT) between the order creation in the Portal and the final validation from mission and/or cell for transmission to MSF Supply.

S03 Confirmation LT

Lead time between the final validation from mission and/or cell for transmission to MSF Supply and the confirmation of the OP in MSF Supply.

S04 Preparation LT

Lead time between the confirmation of the OP in MSF Supply and when the orderline is ready to ship (RTS) which means prepared and invoiced.

S04.1 Consolidation LT

Lead time between when the orderline is RTS and the freight creation.

S05 Documentation LT

Lead time between the freight creation and the request for green light if context with go ahead

S06 Pre-clearance LT

Lead time between the request for green light and when the mission gave the green light for launching the freight (for context with go ahead).

S07 Freight preparation LT

Lead time between the freight creation (or the green light date for context with go ahead) and the moment the freight is shipped from MSF Supply.

S08 Transportation LT

Lead time between the freight shipment in MSF Supply and the arrival date in the port of destination.

S09 Reception LT

Lead time between the arrival date in the port of destination and the mission reception confirmation (if reception is confirmed by the mission)